← Projekte CS-2026-TA-HSI-0001
TSMC Tajwan
Hsinchu, Taiwan
200000.0 m² · 80000.0 Paneele · 1000000 m³/h CALCULATED
Climate / EPW
Jeddah.epw
Jeddah-Abdulaziz.Intl.AP, SAU · 8760 h
SHA-256 bb1afd72ea9a42f2…
ARE_AZ_Abu.Dhabi-Bateen.Exec.AP.412160_TMYx.2011-2025.epw
Abu.Dhabi-Bateen.Exec.AP, ARE · 8760 h
SHA-256 1631528ee2411ae6…
HUN_NGP_Szolnok.AB.128600_TMYx.2011-2025.epw
Szolnok.AB, HUN · 8760 h
SHA-256 1664a3cfe2204bf5…
ARE_DU_Dubai.Minhad.Ab.412164_TMYx.2011-2025.epw
Dubai.Minhad.Ab, ARE · 8760 h
SHA-256 95fe708d2331b0e9…
TWN_NOR_Hsinchu.AP.467560_TMYx.2011-2025.epw
Hsinchu.AP, TWN · 8760 h
SHA-256 a1dd22c483401272…
ESP_IB_Palma.de.Mallorca.AP-Son.San.Juan.AFB.083060_TMYx.2011-2025.epw
Palma.de.Mallorca.AP-Son.San.Juan.AFB, ESP · 8760 h
SHA-256 7533d562dfae5564…
NLD_NB_Eindhoven.AP.063700_TMYx.2011-2025.epw
Eindhoven.AP, NLD · 8760 h
SHA-256 5a4dd2b22593d6bb…
Neues Szenario
Operating = ASSUMED
Scenarios
| ID | EPW | AFD | Tin | nx | Status | |
|---|---|---|---|---|---|---|
| BASE-20260928091527 | TWN_NOR_Hsinchu.AP.467560_TMYx.2011-2025.epw | 5.0 | 16.0 | 16 | READY · AUTO_COOLING |
Simulation Results
| Run | Scenario | Climate | Water m³/a | Cond h | Cooling h | Total MWhth/a | Evidence | View / Actions |
|---|---|---|---|---|---|---|---|---|
| RUN-20260928091643 | BASE-20260928091527 | TWN_NOR_Hsinchu.AP.467560_TMYx.2011-2025.epw | 27836.320 | 6028 | 7769 | 35243.495 | MODELLED |
CS-ENGINE-0.4.7.1 · forced-flow baseline · mixed convection NOT APPLIED · physical yield TO BE VALIDATED.
Energy & PV Baseline
Energy result: RUN-20260928091643 · Scenario: BASE-20260928091527
| Metric | Value | Evidence |
|---|---|---|
| Cooling electricity | 8810.87 MWh/a | CALCULATED · COP ASSUMED |
| Fan electricity | 5.54 MWh/a | MODELLED / CALCULATED |
| Fan Δp | 1.540 Pa | MODELLED_GAP_PLUS_LOCAL |
| Fan electric power | 712.83 W | MODELLED |
| Gap air velocity | 0.556 m/s | MODELLED |
| Fan Reynolds number | 3544 | MODELLED |
| Flow regime | TRANSITION | CALCULATED CLASSIFICATION |
| f laminar (64/Re) | 0.01806 | CALCULATED COMPARATOR |
| f Swamee-Jain | 0.04231 | MODELLED COMPARATOR |
| f Churchill | 0.04228 | MODELLED · TRANSITION CAPABLE |
| Δp gap – Swamee-Jain | 1.541 Pa | MODELLED COMPARATOR |
| Δp gap – Churchill | 1.540 Pa | MODELLED COMPARATOR |
| Local loss ΣK | 0.00 | ASSUMED |
| Δp local | 0.000 Pa | CALCULATED FROM ASSUMED K |
| Δp system | 1.540 Pa | MODELLED |
| Fan efficiency η | 0.60 | ASSUMED |
| Fan model | DARCY_WEISBACH_WIDE_GAP_CHURCHILL | MODELLED |
| Pump electricity | 4494.61 MWh/a | MODELLED / CALCULATED |
| Pump total flow | 32623.3 L/min | CALCULATED |
| Pump peak flow | 77439.6 L/min | MODELLED |
| Coolant design ΔT | 2.00 K | ASSUMED |
| Hydraulic zones | 800 | CALCULATED FROM PANELS / ZONE |
| Panels / hydraulic zone | 100 | ASSUMED / TO BE ENGINEERED |
| Zone pipe | 80 mm · 40.0 m | ASSUMED |
| Zone pipe velocity | 0.135 m/s | MODELLED |
| Zone pipe Δp | 232.5 Pa | MODELLED |
| Main hydraulic loops | 1 | ASSUMED ARCHITECTURE |
| Main pipe | 300 mm · 100.0 m | ASSUMED |
| Main pipe velocity | 7.692 m/s | MODELLED |
| Main pipe Δp | 395858.6 Pa | MODELLED |
| Channel flow | 0.020 L/min | CALCULATED |
| Coolant velocity | 0.006 m/s | MODELLED |
| Coolant Reynolds | 29 | MODELLED |
| Channel Δp | 20.9 Pa | MODELLED · RECTANGULAR LAMINAR |
| Pump system Δp | 396112.0 Pa | MODELLED |
| Pump electric power | 578531.13 W | MODELLED |
| Pump peak electric power | 3252401.54 W | MODELLED |
| Optimizer criterion | CONSTRAINED_ENERGY_INFRASTRUCTURE_PARETO | MODELLED DESIGN SEARCH |
| Optimizer balanced loops | 4 | MODELLED |
| Optimizer balanced main Ø | 500 mm | MODELLED |
| Optimizer balanced pump energy | 36.62 MWh/a | MODELLED COMPARATIVE |
| Optimizer balanced peak velocity | 1.64 m/s | MODELLED |
| Optimizer feasible variants | 14 / 36 | CALCULATED |
| Energy-min variant | 10 loops · Ø 500 mm · 8.52 MWh/a | MODELLED COMPARATIVE |
| Infrastructure-min variant | 10 loops · Ø 250 mm · proxy 49.1 m³ | MODELLED PROXY |
| Pareto variants | 13 | CALCULATED |
| Total CS electricity | 13311.02 MWh/a | CALCULATED |
| EPW GHI | 1592.05 kWh/m²a | SOURCE_DATA |
| PV area | 140000.00 m² | CALCULATED FROM SURFACES |
| Installed PV | 28000.00 kWp | CALCULATED |
| PV generation | 37540.24 MWh/a | MODELLED |
| PV reference plane | ORIENTED_POA_ISOTROPIC_SKY | MODELLED |
| PV transposition | ISOTROPIC_SKY | MODELLED |
| Annual energy balance | 24229.22 MWh/a | CALCULATED |
| Hourly CS load | 13311.02 MWh/a | CALCULATED FROM HOURLY MODEL |
| PV direct use | 6886.64 MWh/a | CALCULATED · NO STORAGE |
| PV surplus | 30653.60 MWh/a | CALCULATED · NO STORAGE |
| Grid import | 6424.38 MWh/a | CALCULATED · NO STORAGE |
| PV self-consumption | 0.183 | CALCULATED · DIRECT PV / PV |
| CS self-sufficiency | 0.517 | CALCULATED · DIRECT PV / CS LOAD |
| Peak CS load | 5945.20 kW | MODELLED / CALCULATED |
| Peak PV | 22804.34 kW | MODELLED |
| Peak grid import | 4724.98 kW | CALCULATED |
Hourly Energy Diagnostics
| Diagnostic | Value | Evidence |
|---|---|---|
| CS active hours | 7769 | CALCULATED |
| Hours with PV surplus | 3956 | CALCULATED |
| Hours with grid import | 4162 | CALCULATED |
| Active CS hours fully supplied by PV | 3607 | CALCULATED · NO STORAGE |
| Maximum PV surplus | 21303.66 kW | CALCULATED |
| Maximum deficit / grid import | 4724.98 kW | CALCULATED |
Monthly Energy Matching
| Month | CS MWh | PV MWh | Direct MWh | Surplus MWh | Grid MWh | CS self-suff. | PV self-cons. |
|---|---|---|---|---|---|---|---|
| Jan | 37.70 | 2133.29 | 28.75 | 2104.54 | 8.95 | 76.2% | 1.3% |
| Feb | 42.90 | 2257.47 | 32.10 | 2225.37 | 10.80 | 74.8% | 1.4% |
| Mar | 214.95 | 3242.12 | 131.51 | 3110.61 | 83.44 | 61.2% | 4.1% |
| Apr | 566.78 | 3621.39 | 311.87 | 3309.52 | 254.91 | 55.0% | 8.6% |
| May | 1355.01 | 3507.61 | 721.32 | 2786.28 | 633.69 | 53.2% | 20.6% |
| Jun | 2137.24 | 3776.11 | 1138.60 | 2637.50 | 998.64 | 53.3% | 30.2% |
| Jul | 2703.74 | 4377.15 | 1409.11 | 2968.04 | 1294.63 | 52.1% | 32.2% |
| Aug | 2574.34 | 4027.39 | 1299.91 | 2727.48 | 1274.43 | 50.5% | 32.3% |
| Sep | 1741.47 | 3671.97 | 866.15 | 2805.81 | 875.32 | 49.7% | 23.6% |
| Oct | 1182.63 | 2960.55 | 568.04 | 2392.50 | 614.58 | 48.0% | 19.2% |
| Nov | 599.26 | 2208.84 | 292.10 | 1916.74 | 307.16 | 48.7% | 13.2% |
| Dec | 155.00 | 1756.37 | 87.18 | 1669.19 | 67.82 | 56.2% | 5.0% |
Energy Matching by EPW Hour
| EPW hour | CS MWh/a-bin | PV MWh/a-bin | Direct | Surplus | Grid |
|---|---|---|---|---|---|
| 01 | 514.23 | 0.00 | 0.00 | 0.00 | 514.23 |
| 02 | 498.95 | 0.00 | 0.00 | 0.00 | 498.95 |
| 03 | 486.71 | 0.00 | 0.00 | 0.00 | 486.71 |
| 04 | 476.82 | 0.00 | 0.00 | 0.00 | 476.82 |
| 05 | 461.37 | 0.00 | 0.00 | 0.00 | 461.37 |
| 06 | 452.98 | 0.00 | 0.00 | 0.00 | 452.98 |
| 07 | 473.99 | 275.00 | 242.42 | 32.57 | 231.57 |
| 08 | 504.56 | 1246.52 | 486.69 | 759.83 | 17.87 |
| 09 | 524.79 | 2554.02 | 520.46 | 2033.56 | 4.32 |
| 10 | 555.16 | 3800.24 | 554.17 | 3246.08 | 1.00 |
| 11 | 601.68 | 4746.80 | 601.28 | 4145.52 | 0.40 |
| 12 | 622.89 | 5249.40 | 622.89 | 4626.51 | 0.00 |
| 13 | 645.47 | 5262.55 | 645.47 | 4617.08 | 0.00 |
| 14 | 661.26 | 4819.81 | 661.16 | 4158.66 | 0.11 |
| 15 | 662.10 | 4003.27 | 661.52 | 3341.75 | 0.58 |
| 16 | 653.25 | 2945.59 | 649.55 | 2296.05 | 3.70 |
| 17 | 617.98 | 1772.18 | 608.40 | 1163.78 | 9.58 |
| 18 | 601.86 | 705.11 | 483.32 | 221.79 | 118.54 |
| 19 | 571.28 | 144.82 | 134.40 | 10.42 | 436.88 |
| 20 | 560.39 | 14.92 | 14.92 | 0.00 | 545.47 |
| 21 | 553.66 | 0.00 | 0.00 | 0.00 | 553.66 |
| 22 | 547.07 | 0.00 | 0.00 | 0.00 | 547.07 |
| 23 | 537.06 | 0.00 | 0.00 | 0.00 | 537.06 |
| 24 | 525.50 | 0.00 | 0.00 | 0.00 | 525.50 |
EPW hours are end-of-hour labels (1–24). Diagnostics aggregate the same hourly arrays used by v0.9.0; no storage or load shifting is applied.
v1.0 Energy Architecture
GRID-COUPLED PV WITHOUT STORAGE. PV is used directly when coincident with CS demand. Surplus is treated as grid export potential; deficits are grid import. Battery, chilled-water, PCM and ice storage are not part of the v1.0 product baseline. The storage investigation is preserved as a research branch.
v1.3 Advanced Grid Economics
| Metric | Value | Evidence |
|---|---|---|
| Grid import | 6424.38 MWh/a | CALCULATED FROM HOURLY MATCHING |
| Grid export | 30653.60 MWh/a | CALCULATED FROM HOURLY MATCHING |
| Curtailed export | 0.00 MWh/a | CALCULATED |
| Import cost | € 642437.52/a | CALCULATED · TARIFF PROJECT INPUT |
| Export revenue | € 459803.98/a | CALCULATED · TARIFF PROJECT INPUT |
| Fixed grid cost | € 0.00/a | PROJECT INPUT / ASSUMED |
| Peak grid import | 4724.98 kW | CALCULATED FROM 8760 HOURS |
| Demand charge | € 0.00/a | CALCULATED · PROJECT INPUT |
| Weighted import price | € 100.00/MWh | CALCULATED |
| Weighted export price | € 15.00/MWh | CALCULATED |
| Net grid energy cost | € 182633.55/a | CALCULATED |
| Break-even export price | € 20.96/MWh | CALCULATED DIAGNOSTIC |
v1.3 uses the actual 8760 hourly import/surplus arrays. Off-peak/peak tariffs, demand charge and export limit are PROJECT INPUT / ASSUMED. Economic post-processing only: no storage, no load shifting and no change to the physical baseline. Taxes and detailed grid fees are not yet modelled.
v1.4 Project Economics / Energy Cash Flow
| Metric | Value | Evidence / boundary |
|---|---|---|
| Direct PV use | 6886.64 MWh/a | CALCULATED FROM 8760 HOURS |
| Direct PV avoided-purchase value | € 688664.48/a | CALCULATED · COINCIDENT IMPORT TARIFF |
| Export revenue | € 459803.98/a | FROM v1.3 GRID ECONOMICS |
| Gross energy value | € 1148468.45/a | CALCULATED |
| Annual project OPEX | € 0.00/a | PROJECT INPUT / ASSUMED |
| Year-1 net project cash flow | € 1148468.45 | CALCULATED · ENERGY-ONLY |
| Project CAPEX | € 0.00 | PROJECT INPUT / ASSUMED |
| NPV | € 11275832.56 | CALCULATED · ENERGY-ONLY |
| Simple payback | - years | CALCULATED DIAGNOSTIC |
| Discounted payback | - years | CALCULATED DIAGNOSTIC |
Energy-only project cash flow. Direct PV is valued at the coincident import tariff; export at v1.3 tariff. Demand/fixed grid charges are reported but not claimed as avoided investment benefits because a no-PV counterfactual peak/grid contract is not yet modelled. Water value, cooling-service value, taxes, financing and full ClimaStrat CAPEX allocation are excluded.
PV Surface Diagnostics
| Surface | Area | Tilt | Azimuth | Annual POA | Installed | Generation | Specific yield kWh/kWp·a | Share |
|---|---|---|---|---|---|---|---|---|
| ROOF | 140000.00 m² | 0.0° | 180.0° | 1577.32 kWh/m²a | 28000.00 kWp | 37540.24 MWh/a | 1340.7 | 100.0% |
| SOUTH_FACADE | 0.00 m² | 90.0° | 180.0° | 859.07 kWh/m²a | 0.00 kWp | 0.00 MWh/a | 0.0 | 0.0% |
| EAST_FACADE | 0.00 m² | 90.0° | 90.0° | 788.75 kWh/m²a | 0.00 kWp | 0.00 MWh/a | 0.0 | 0.0% |
| WEST_FACADE | 0.00 m² | 90.0° | 270.0° | 871.02 kWh/m²a | 0.00 kWp | 0.00 MWh/a | 0.0 | 0.0% |
Azimuth: N=0°, E=90°, S=180°, W=270°. EPW GHI/DNI/DHI = SOURCE_DATA; POA and generation = MODELLED; module efficiency, PR and albedo = ASSUMED.